Wandoo Gravity Structure - Western Australia
Design of temporary works, construction planning and development of method statements for constructing the gravity structure. Work included:

- Slipforming cassion walls and shafts

- Internal and external pipework installation

- Topside connection

- External access towers and mast climbers

Mythaun Cable Stay Bridge - Vietnam
Design of temporary works, construction planning development of method statements, preparation of cost estimates for Leighton Asia tender submission. Work included:

- Technical review of 85m deep pile construction methods

- Development of Pile Cap method statement

- Programme sequence for mast construction

- Approach ramp construction method

- Approach ramp precast beam system

- Precast construction method for main span segments

Eastern Distributor Project - Sydney
Construction management, design development, cost planning & temporary works planning consultant for the Dacey Todman and Parkway zones. Work included:

- Development of management programmes

- Development of tunnel portal excavation sequence at Parkway

- Development of traffic staging plans

- Major service relocations

- Implementation of groundwater control systems

- Excavation methods in Dacey/Todman cut/cover tunnel

- Excavation methods in Dacey/Todman pump shaft

- Spoil disposal

Pakse Bridge Project - Thailand & Laos
Preparation of construction programme, manage, supervise and commission 450T of structural steel formwork and falsework for the long line casting of bridge segments, on behalf of VSL Thailand.
10 10 10
Narrows Bridge - Perth
Development of construction method, construction programme, the temporary works design of the formwork and falsework systems for the incrementally launched bridge, on behalf of Leighton Contractors.